Below is a selection of available project profiles that Layfield has been involved in. The profiles provide brief descriptions often coupled with photographs of projects Layfield has done. If you have any questions about specific projects or would like to discuss a project you are working on please feel free to contact us. Select from the links below to view our project profiles.
24XT Geogrid Hwy 1 Pile Embankment
LOCATION: Trans Canada Highway 1- Sprott Street Overpass- Burnaby, BC TIMEFRAME: April 2011- June 2011
SCOPE OF WORK: Building up a pile embankment for highway overpass extensions with use of Mirafi’s 24XT geogrid
PROJECT PARTNERS:
Owner:PMH1- PK/F Joint Venture
Client: Peter Kiewit & Sons
Material supplier: Mirafi/ TenCate
Aqua Dam Flood Control - Burnaby 2007
LOCATION: Burnaby, British Columbia, Canada
TIMEFRAME: Spring 2007
PRODUCT; Flood Control Aqua Dams (3' high)
PROJECT PARTNERS:
Owner: City of Burnaby
Supplier: Layfield
Aqua Dam Flood Control - Manitoba 2011
LOCATION: Manitoba
TIMEFRAME: Jan - May 2011
SCOPE OF WORK: Design and Supply a Rapid Deployment Flood Protection System – Aqua Dam®
PROJECT PARTNERS:
Owner: Manitoba Infrastructure and Transportation
Installation: Layfield, Manitoba Infrastructure and Transportation Crews, Canadian Armed Forces, and Local Volunteers
Supplier: Layfield
Aqua Dam Flood Control - Red River 2009
LOCATION: Manitoba
TIMEFRAME: April 2009
PRODUCT: 250 Flood Control Aqua Dams - 3' by 100' Coffer Dams
PROJECT PARTNERS:
Owner: Government Regulator
Supplier: Layfield
Atlantis Storm Water Detention - Shell Gas Station
LOCATION: Abbotsford, BC
TIMEFRAME: April 2010
SCOPE OF WORK: Supply Atlantis Stormwater Detention System, installation supervision
PROJECT PARTNERS:
Owner: Shell Canada Products
Client: Corix Water Products
Engineer: Hub Engineering
Installation: King Hoe Excavating
Supplier and Installation Supervision: Layfield
Baffle Curtain - City of London
LOCATION: London, Ontario
TIMEFRAME: Winter/Spring 2011
SCOPE OF WORK: 600 m long by 8.4 m high baffle curtain
PROJECT PARTNERS:
Owner: City of London
Contractor: McKay Cocker
Installation: Layfield
Egrid 170R Hwy 22 Bridge Abudment
LOCATION: Drayton Valley, AB
TIMEFRAME: October 2010
SCOPE OF WORK: An embankment for the new bridge needs to be built to crossover the North Saskatchewan River on hwy 22.
PROJECT PARTNERS:
Owner: Alberta Transportation
Client: MCL Group (sub for Graham Cons)
Installation: MCL Group
Material supplier: Layfield
Enviro Liner 4000 - Frac Water Tank
LOCATION: NE British Columbia
TIMEFRAME: March, 2010
PRODUCT: Enviro Liner® 4030, Steel Water Tank (1.5 million liters capacity)
PROJECT PARTNERS:
Owner: Junior Oil and Gas producer
Supply and Install: Layfield
Enviro Liner 6000 - Frac Water Storage Pond
LOCATION: Horn River Basin, NE British Columbia
TIMEFRAME: January, 2009
PRODUCT: Enviro Liner® 6140,Geocomposite leak detection layer, Enviro Liner® 4040
PROJECT PARTNERS:
Owner: Petro Canada Limited
Design/Build: Layfield
Materials Supplier: Layfield
Enviro Liner 6000 - Potable Water Tank
LOCATION: El Cajon, CA
TIMEFRAME: November 2007
PRODUCT: Enviro Liner 6030 cover, 36 mil RPP liner
PROJECT PARTNERS:
Developer: TC Construction
Supplier: Layfield
Floating Cover and Liner for Water Reservoir
LOCATION: City of Astoria, Oregon
TIMEFRAME: July - October 2009
PRODUCT: Geomembrane, Floating Cover, and Lining System
PROJECT PARTNERS:
Owner: City of Astoria
Engineer: MWH
Materials Supplier: Layfield
Installation: Layfield
Geoblock Permeable Paving for Private Residence
LOCATION: Private Residence, Crescent Beach, Surrey, B.C., Canada
TIMEFRAME: April 2011
SCOPE OF WORK: Excavate existing sod and other organic materials, install sub-grade , GEOBLOCK permeable paver system & new sod
PROJECT PARTNERS:
Owner: Mr. & Mrs. Rose
Client: Took Engineering
Installation: Martin Pro Builders
Material supplier: Layfield Geosynthetics / Presto Geosystems
StormChamber - Conestoga College
LOCATION: Cambridge, Ontario
TIMEFRAME: September 2010
SCOPE OF WORK: 700m3 StormChamber System
PROJECT PARTNERS:
Owner: Conestoga College
Client: VanBots/Carillion
Installer: Groundworks Construction
Tailings pond rehabilitation
LOCATION: Northern Alberta (Oilsands)
TIMEFRAME: Winter 2010
PRODUCT: High Strength Geotextiles
PROJECT PARTNERS:
Material Supplier: Tencate Mirafi
Fabrication and Installation: Layfield
Turbidity Barrier - OPG HydroElectric Facility
LOCATION: Stoney Falls, Ontario
TIMEFRAME: June 2010 – 2015
SCOPE OF WORK: Turbidity Barrier Installation for Sediment Control
PROJECT PARTNERS:
Ontario Power Generation
Layfield
KAP Kiewit Alarie Partnership
Battlefield Equipment Rentals
Turbidity Curtain - Davy Crockett Shipwreck
LOCATION: Washougal, WA (Columbia River)
TIMEFRAME: April 2011
SCOPE OF WORK: 2400 Linear Feet Type 1 Turbidity Curtain (30-40 ft deep)
PROJECT PARTNERS:
Owner: US Coast Guard
Client: Bergerson Construction
Supplier: Layfield